– with SUM 1.0 SP 19 and higher, the Report RSUPG_TADIR_COMPONENT_CHECK (attached in SAP Note 2318321) will be executed by SUM automatically. – the load-based approach does not allow any inactive objects, see SAP Note 2435892. You may check the following SAP notes: SAP Note 2318321, SAP Note 530335. It is an upgrade, as the shadow system is created from DVDs, not cloned from the customer system (compare my outdated SCN blog on shadow system: SUM: introduction to shadow system). It is not an update in the sense of the Enhancement Packages (EHPs) until now. SAP Business Suite 7 Innovations 2016 with SAP ECC 6.0 EHP 8 (6.18) is based on SAP NetWeaver 7.50 (NW 7.50), and the procedure is load-based. These are the aspects that I am aware of: I guess you know: Enhancement Package 8 for SAP ECC 6.0 is different, from our technical perspective of Software Logistics.
0 Comments
Leave a Reply. |